Ask a question

Thermal oil boiler VAS Turboden, YC 2003, overhaul 2016

Boiler plant VAS 4.2 MW ash slide 2 trough chain conveyors MAXXTEC heater ORC electrical maximum power 700 kW Turbine T600 Electric cabinets with PLC control Safety heat exchanger Thermal oil pumps cooler diesel pumps collection tank surge tank Economizer heat recovery in a thermal oil heat exchanger
IMG_71312