Dismantling in the Schwarzwald /Germany, loading to Irkutsk / Bratsk region.
In the summer of 2018 a complete sawmill was dismantled and shipped to Russia.
The complete delivery was 26 trucks.
Saw mill has capacity: 120,000 FM wood per year and is designed for the diameter of 10 to 55 cm.
2019: Construction in Russia